20
Bowflex Xtreme
®
2 SE Assembly Manual
Assembly Guide
Step 20 Cable and Pulley Routing –
Connect Right Squat Cable through the Floating and Main Assembly Pulleys
Slide the Right Squat Frame Pulley (6) to the furthest back hole, as indicated in Figure 20.
Unwrap the Right Squat Cable from the (6) Pulley and guide the Cable, threading under and through the Rear
Cross Bar Pulley (
7), and up through the Floating (8) Pulley. Follow the arrows as indicated in Figure 20.
Continue to guide the Cable down through the Inner Right Frame Rail Pulley (9), up through the Right Pulley Arm
Pulley (
10), as shown in Figure 20.
Finally, insert the Cable End through the Cable End Stop Ball and attach the Cable Core, as completed during
Step 19.
10
6
8
7
9