Bowflex Xtreme 2 SE Home Gym User Manual


 
8
Bowflex Xtreme
®
2 SE Assembly Manual
Step 5 Install Squat Pulley Frame
Parts:
• Left Squat Pulley Frame
• Right Squat Pulley Frame
• Main Assembly
• 2 Slider Pulleys w/o Decal
• Left Squat Frame Connector
• Right Squat Frame Connector
Hardware:
• 1 Button Head Screw (3/8" X 5")
• 1 Nylock Nut (3/8
")
• 6 Button Head Screws (3/8
" X 3/4")
• 8 Washers (3/8
")
Tools: 7/32" Hex Wrench & Adjustable
or Socket Wrench
5-1 Place one Squat Pulley Frame on each side
of the Seat Support Rail as shown, and align
the top screw holes. Secure using a 3/8" X
5" screw, washer and nut in the top hole as
shown in
Detail 5a.
5-2 Install screws and washers through the
bottom holes of each Squat Pulley Frame
into the Support Rail as shown in
Detail 5a.
5-3 Slide one Slider Pulley onto the free end
of the Left Squat Pulley Frame as shown in
Detail 5b. Lock the pulley in position near
the Support Rail.
5-4 Slide the Left Squat Frame Connector onto
the end of the Left Frame Rail and the Left
Squat Pulley Frame.
5-5 Install screws and washers to secure the
Squat Frame Connector to the Squat Pulley
Frame and the Frame Rail as shown in
Detail 5b.
5-6 Repeat Steps 5-3 through 5-5 for the Right
Squat Pulley Frame.
Button
Head Screw
Flat
Washer
Nylock
Nut
Left Squat
Pulley Frame
Flat
Washers
Button Head
Screws
5" Button
Head Screw
Assembly Guide
3/4" Button
Head Screw
Flat
Washer
Left Squat
Pulley Frame
Slider Pulley
Detail 5a
Detail 5b
Slider Pulley
Flat
Washer
Left Squat Frame
Connector
Flat Washer
Button
Head Screw
Left Frame
Rail
Right Squat
Pulley Frame
Left Squat Frame
Connector
Right Squat
Frame Connector
Detail
5a
Detail
5b
Slider Pulley