Page 8
SKU 93167
For technical questions, please call 1-800-444-3353
9. Open the Hydraulic Fluid Fill Plug (11). Fill the Hydraulic Fluid Reservoir with 3.5 gal-
lons of high quality hydraulic fluid. Check that the Fluid level is between the lines on the
attached Dipstick. Close the Hydraulic Fluid Fill Plug (11) securely.
6. Mount the Boom Extension (34) to the Main Boom (36) using Pin (42), left, and Clevis
Pin No. 1 (29), top (shown on inset to the right). Secure both pins with Cotter Keys.
7. Attach the towing Hitch Coupler (58) to the Frame Assembly (90) under the Engine (74)
using Hex Bolts (75) and Hex Nuts (84). See illustration on previous page.
Hose Connection Diagram
Bucket
Control
Cylinder
Boom
Extension
Cylinder
Main Boom
Cylinder
Boom Swing
Cylinder
Control
Panel (23)
Hydraulic Fluid
Reservoir
part of Frame (90)
Hydraulic
Pump (65)
8. Connect, tighten, and check all hydraulic hose
fittings to the proper connections, as shown
above. Hoses and fittings are numbered. Se-
curely tighten all fittings.
NOTE: NEVER use pipe thread seal tape on
hydraulic fittings.
Assembly instructions continued on next page.
REV 07f