A SERVICE OF

logo

Page 15
SKU 93167
For technical questions, please call 1-800-444-3353
Digging Depth Adjustment
1. This Trencher can be used with two arm positions. See the illustration below.
2. While the end of the boom is being supported: Remove the Pin (42), align the cylinder
with the appropriate hole, insert the Pin (42), and secure it with the Hair Pin (51).
Cylinder (26)
Pin (42)
Boom
Pivot (38)
Boom
Pivot (38)
Main Boom
(36)
Main Boom
(36)
Boom Controls
Controls Operate by Pushing
In or Pulling out
Bucket: IN - OUT
Boom Extension: IN - OUT
Main Boom: IN - OUT
Boom Swing: LEFT - RIGHT
Boom Operation
1. With the Engine running, sit in the operator Seat (73) and pull the Main Boom handle
control backward to raise the Main Boom (36).
2. Pull back on the Boom Extension handle control to raise the Boom Extension (34).
3. Push forward on the Bucket handle control to open the Bucket Assy (32).
REV 07f