Weider WESY97300 Home Gym User Manual


 
11
16. Wrap the High Cable (23) around a “V”-Pulley
(6). Attach the “V”-Pulley and a Long Cable
Trap (50) to the indicated bracket on the
Front Upright (42) with a 3/8” x 2 1/2” Bolt (7)
and a 3/8” Nylon Locknut (21). Be sure that
the Long Cable Trap is positioned to hold
the Cable in place.
17. Route the High Cable (23) around the “V”-
Pulley (6) on the Left Arm (47). Be sure that
the Cable is in the groove of the Pulley
and that the Long Cable Trap (50) is posi-
tioned to hold the Cable in place. Tighten
the 3/8” x 2 1/2” Bolt (7) and the 3/8” Nylon
Locknut (not shown).
18. Route the High Cable (23) around the “V”-
Pulley (6) on the Right Arm (48). Be sure
that the Cable is in the groove of the “V”-
Pulley and that the Long Cable Trap (50) is
turned to hold the Cable in place. Tighten
the 3/8” x 2 1/2” Bolt (7) and the 3/8” Nylon
Locknut (not shown).
19. See the inset drawing. Lubricate the 5/16” x
5” Bolt (68). Attach the Pulley Bracket (20) to
the Top Frame (55) with the Bolt and a 5/16”
Nylon Locknut (3). The Pulley Bracket must
be oriented as shown.
Route the High Cable (23) around the 3.1/2”
Pulley (15) attached to the Pulley Bracket
(20). Be sure that the Cable is in the
groove of the Pulley and that the Cable
Trap (66) is turned to hold the Cable in
place. Tighten the 3/8” x 2” Bolt (12) and the
3/8” Nylon Locknut (not shown).
18
19
CABLE ASSEMBLY
50
7
23
66
15
12
20
23
48
6
16
17
50
23
7
47
23
7
21
6
50
6
42
68
55
20
3