12
20. Wrap the High Cable (58) around a “V”-Pulley
(50). Attach the Pulley and a Long Cable Trap
(31) to the indicated bracket on the Front
Upright (42) with an M10 x 55mm Bolt (86)
and an M10 Nylon Locknut (21). Be sure that
the Long Cable Trap is positioned to hold
the Cable in place.
21. Route the High Cable (58) around the “V”-
Pulley (50) on the Left Arm (47). Be sure that
the Cable is in the groove of the Pulley
and that the Long Cable Trap (31) is posi-
tioned to hold the Cable in place. Tighten
the M10 x 55mm Bolt (86) and the M10 Nylon
Locknut (not shown).
22. Route the High Cable (58) around the “V”-
Pulley (50) on the Right Arm (48). Be sure
that the Cable is in the groove of the
Pulley and that the Long Cable Trap (31) is
turned to hold the Cable in place. Tighten
the M10 x 55mm Bolt (86) and the M10 Nylon
Locknut (not shown).
23. Attach the Pulley Bracket (20) to the Top
Frame (55) with the M8 x 120mm Bolt (68)
and an M8 Nylon Locknut (3). Do not over-
tighten the Nylon Locknut; the Pulley
Bracket must be able to move freely.
See the inset drawing. Route the High Cable
(58) around the 90mm Pulley (15) attached to
the Pulley Bracket (20). Tighten the M10 x
50mm Bolt (12) and an M10 Nylon Locknut
(not shown). Be sure that the Cable is in
the groove of the Pulley and that the Cable
Trap (66) is turned to hold the Cable in
place.
23
20
86
86
31
31
50
50
21
58
58
21
22
CABLE ASSEMBLY
42
47
86
31
50
58
20
68
3
55
48
Bracket
58
15
66
12