18
15
48
47
Bracket
Lubricate
Axle
55
65
68
45
44
47
16
17
CABLE ASSEMBLY
ARM ASSEMBLY
12
15. Press a 1 3/4” Square Inner Cap (44) into the
lower end of the Left Arm (47). Using a small
amount of soapy water, slide a Large Foam
Pad (45) onto the Left Arm.
Assemble the Right Arm (48, not shown) in
the same manner.
16. Lubricate both axles on the Top Frame (55).
Slide the Right Arm (48) onto the right axle.
Note: Be careful not to confuse the Right
Arm with the Left Arm (47). Make sure that
the upper end of the Right Arm is behind
the indicated bracket on the Top Frame (55).
Tap two 1” Retainers (68) and a 1” Round
Outer Cap (65) onto the right axle. Make sure
the teeth on the Retainers bend toward the
Round Outer Cap, as shown in the inset
drawing.
Attach the Left Arm (47) in the same manner.
17. Important: As you assemble the cables in
steps 17–30, refer to the CABLE DIAGRAM
on page 21 for correct cable routing.
Route the Short Cable (23) up through the
hole in the Top Frame (55) as shown. Make
sure the ball is on the indicated side. Attach a
“V”-Pulley (6) to the hole in the Top Frame
usinga 3/8” x 3 1/4” Bolt (8), two 3/8” Washers
(9), two 5/8” x 1/2” Spacers (82), and a 3/8”
Nylon Locknut (21) as shown. Do not over-
tighten the Nylon Locknut; the Pulley must
be able to turn freely.
18. Route the Short Cable (23) around another
“V”-Pulley (6). Hold a Long Cable Trap (50)
against the Pulley so that it secures the Short
Cable in the groove of the Pulley.
Attach the “V”-Pulley (6) and the Long Cable
Trap (50) to the bracket (not shown) on the
Top Frame (55) using a 3/8” x 2 1/4” Bolt (76)
and a 3/8” Nylon Jamnut (67). Do not over-
tighten the Nylon Jamnut; the Pulley must
be able to turn freely.
76
67
55
50
6
21
82
55
Ball
82
9
9
8
23
23
6
65
68