17
AB1
AB1
Z39
Z39
Q06
Q06
Q07
Q07
7
STEP
• Align holes in rear shield with the holes
in the brackets on the back side of the
weight stack; loosely secure using 8 bolts
(M5x10). Take the left side shield and
repeat on front side of weight stack tower
using five bolts (M5x10). Tighten interior
brackets. Repeat for the right side shield.
Tighten all bolts.
• Attach two slip on nuts (Z39) to the left
side of the weight stack tower (AB1).
Snap two halves of top cover (Q06 &
Q07) together. With tallest point facing
the rear of the machine, place the assembled
top covers on top of the weight stack
tower and secure using six bolts (M5x15).
RED BAG