![](http://pdfasset.owneriq.net/4/32/4323aca8-d195-4742-8893-89215d9519f3/4323aca8-d195-4742-8893-89215d9519f3-bg10.png)
6
STEP
• With the loop end of the cable in your
hand, guide the cable through the hole in
top of the weight stack tower (AB1) and
around pulleys A and B. Go through other
hole in weight stack tower and all the way
down and around pulley C. Now guide
the cable around pulleys D (loosen pulley
D and make sure cable is routed between
the post and the pulley) and E and through
pulleys F and G. Attach loop end into the
range of motion plate (AF1) by sliding a
shoulder bolt (M8x12) through the bracket
and loop. Secure with a nut(M8).
YELLOW BAG
A
B
C
D
E
F
G
16