AC5
AC5
AC1
AC1
AB1
AB1
1
STEP
NOTE: During assembly, it is recommended
to ensure that all bolts are in place and
partially threaded before completely
tightening any one bolt. During assembly
steps 1 thru 5, do not completely tighten
any bolts until completion of Step 5.
• Lay the main floor support (AC1) on the
ground, pulley brackets facing up. Place
the end opposite of the pulley brackets
against the side of the left floor support
(AC5). Align the main floor support holes
with the 3rd and 4th holes from the end of
the left floor support. Secure using two
bolts (M10x70), four flat washers
(10.2x22x2), and two nylon nuts (M10).
• Stand the weight stack tower (AB1)
upright and place the previously
assembled floor supports (AC1 & AC5) up
against holes in the tower. Slide three bolts
(M10x70) with three flat washers
(10.2x22x2) through the holes, securing
the bolts with three more flat washers and
three nylon nuts (M10).
• Attach two pulleys to weight stack using
a bolt (M10x46), two flat washers
(10.2x22x2), and a nylon nut (M10) for
each pulley.