Vision Fitness ST760 Home Gym User Manual


 
15
6
STEP
• Align holes in rear shield (Q01) with the
holes in the brackets on the back side of
the weight stack tower (AB1); secure using
10 bolts (M5x10). Take the left side shield
(Q03) and repeat on front side of weight
stack tower using six bolts (M5x10).
Tighten interior brackets (B09 & B10).
Attach right side shield (Q02) with six
bolts (M5x10)
• Place slip-on nuts over holes on the left
upright of the weight stack tower (AB1).
Snap two top covers (Q05 & Q06)
together. With tallest point facing the rear
of the machine, place the top covers on
top of the weight stack tower and secure
using six bolts (M5x15).
YELLOW BAG
AB1
AB1
Q02
Q02
Q03
Q03
Q01
Q01
Q06
Q06
Q05
Q05