Vision Fitness ST760 Home Gym User Manual


 
14
5
STEP
• With the loop end of the cable in your
hand, guide it through hole in top of weight
stack tower, and around pulleys A and B.
Bring it down along the weight stack tower,
through pulley C and around pulley D.
Loosen or remove pulley D to be able to
ensure cable is routed between the post and
the pulley. Weave cable through swing arm
pulleys, going through pulleys E, F, G, H, I,
J. End at the main frame, securing the loop
on the connecting bracket by sliding a flat
washer (10.2x22x2) onto the bolt
(M10x70). Slide a bushing onto bolt and
put bolt through hole in main frame, through
loop end of cable, and through other side of
main frame. Slide another bushing and flat
washer onto bolt and secure with a nylon nut
(M10).
• Remove nut on bolt end of cable and
place the selector pin tether on bolt shaft.
Thread the nut on the bolt end of the cable
all the way to the head of the bolt. Thread the
bolt into the header plate, making sure that
there is a minimum of 0.5” of engagement.
Secure by tightening nut onto header plate.
BLACK BAG
A
B
C
D
E
F
G
H
I
J