Vision Fitness ST750 Home Gym User Manual


 
13
4
STEP
• The swing arm assembly is constructed
by inserting the axle (D19) through the
bracket (Z27), then adding a wavy
washer (20.7x29.1x0.3), range of motion
adjustment (AH1), spacer (20.7x26.5x4),
and swing arm (AD1). See diagram for
orientation. Slide the axle through the hole
in the swing arm support (AC2). Attach a
flat washer (12.5x50x2), lock washer
(12.2x21.5x3), and bolt (M12x25).
Make sure the flat near the axle head lines
up with the flat in bracket Z27.
• Attach the leg pad (AD2) exercise arm
to the lower part of swing arm by lining up
the holes and inserting the axle (D20).
Attach a lock washer (12.2x21.5x3), flat
washer (13x26x2.5), and bolt (M12x25)
to each end. Tighten. Make sure the end
of the axle with the flat on it is inserted in
the exercise arm, mating with the opening
that has the flat in it.
• Insert the thigh pad support (AD3) into
the remaining slot on the swing arm
support and secure using bolt (M12x25),
flat washer (26.5x50x2), lock washer
(12.2x21.5x3). Make sure the pull pin is
inserted in one of the location holes in
plate during assembly.
• Tighten all hardware. When tightening
weight stack tower bracket (Z27), make
sure the axle (D19) is parallel to the floor.
GREEN BAG