Vision Fitness ST750 Home Gym User Manual


 
11
2
STEP
• Stand up the weight stack tower (AB1)
and align the bottom holes with the ends
of both center and rear floor supports.
Fasten together using four bolts (M10x70),
eight flat washers (10.2x22x2), and four
nylon nuts (M10).
• Attach two pulleys to the weight stack
tower with two bolts (M10x48), four flat
washers (10.2x22x2) and two nuts (M10).
• Attach the bracket (Z27) to the outside
of weight stack tower (see diagram for
orientation) with four flat washers
(10.2x22.2x2), two bolts (M10x65), and
two nuts (M10). Partially tighten.
BLUE BAG