093
24.
25.
.26.
27.
29.
30;
BODYSMiTH PROSYSTEM ASSEMBLY INSTRUCTIONS
To install SECONDARY CABLE (PB2559-1), start by inserting the end of the CABLE, WITHOUT the
WHITE BALL under the FRONT PULLEY in the LOW ROW PULLEY HOUSING on the MAIN
UPRIGHT. (REMOVE PULLEY FOR EASE OF INSTALLATION)
Push the CABLE under the FRONT PULLEY and through the HOLE of the 1VLAIN UPRIGHT to the
PULLEY on the UPRIGHT BRACE of the I~L~_IN UPRIGHT. Pull the CABLE until the WHITE
BALL stops against the FRONT PULLEY and the LOW ROW PULLEY HOUSING.
Pull the CABLE around the BRACE PULLEY and up to the SECOND PULLEY on the PULLEY
BLOCK SYSTEM. (NOTE: THE CABLE MUST BE ROUTED AROUND THE SECOND PULLEY
FROM THE REAR TO THE FRONT)
Pull the CABLE around the SECOND PULLEY of the PULLEY BLOCK SYSTEM ~nd down to the
first HOLE above the larger set of HOLES on the MAIN UPRIGHT. Attach the end of the CABLE to
the MAIN UPRIGHT, using one (I) 3/8 X 2-3/4 IN. BOLT. one (!) 3/8 IN. WASHER, one (I) 3/8
LOCK WASHER and one (1) 3/8 IN. NUT. (SEE DETAIL
See CABLE ROUTi~NG DIAGRAM (DETAIL A) for help in completing STEP 24.
TIGHTEN ALL LOOSE PULLEY CONNECTIONS MADE TO THIS POINT.
Slide four (4) I X 1~ IN. GRIPS over each end of both the LAT BAR, and the LOW ROW BAR. (NOTE:
IF A LUBRICANT IS REQUIRED, RUBBING ALCOHOL THOROUGHLY COAXING
INSIDE OF THE GRIP IS THE BEST MATERIAL TO USE) (SEE DETAIL AND B)
Attach the LAT BAR to the PRIMARY CABLE, and the LOW ROW BAR to the SECONDARY
CABLE, by using two (2) 5/16 IN. SNAP HOOK. (SEE DETAIL A AND
To adjust the LOW ROW BAR. Remove the LOW ROW BAR from the 5/16 IN. SNAP HOOK on the
SECONDARY CABLE, and attach the 24 LINK CHAIN. Attach another 5/16 IN. SNAP HOOK to the
LOW ROW BA:R and adjust it to the desired CHAIN LINK. (SEE DETAIL B)
Attach two (2) sets of UPRIGHT LABELS (designated #1 to #21)to the inside surface of both ~0~
UPRIGHTS. (SEE DRA~VING)
To use the LOW ROW FOOT BRACE, slip it over the BASE LEGS, and up against 15ae UPKIGHTS of
the FRONT UPRIGHTS. (SEE DRAWING)