Life Fitness 8352100 REV. B Home Gym User Manual


 
11
12
50
44
44
49
1
11
44
50
STEP 2:
Use the following hardware contained in Blister Pack (7-1):
M10 x 70mm SCREW (Qty. 4)
M10 WASHER (Qty. 8)
M10 HEX NYLOCK NUT (Qty. 4)
Attach the CHIN UP BAR (12) between the LEFT TOWER (1) and RIGHT TOWER (11) using four M10 x 70mm
SCREWS (50), eight M10 WASHERS (44), and four M10 HEX NYLOCK NUTS (49). Finger tighten only.
NOTE: Make sure the CHIN UP BAR (12) is in the correct position as shown.
Tighten all FRAME and CHIN UP BAR screws and nuts securely.