17
7
STEP
• Attach pulleys A and B to the weight
stack tower with a bolt (M10x48), a flat
washer (10.2x22x2) on each side, and a
nut (M10).
• With loop end of cable (F17) in hand,
guide it through hole in top of weight stack
tower and around pulleys A and B. Follow
the weight stack down to go around pulley
C. Loosen pulley D and make sure the
cable is routed between the pulley and the
post. Retighten. Weave the cable around
pulley E, F, and G. Terminate after placing
the loop through the bottom of the swing
arm tube, where it will be secured by slid-
ing a 15x21.5 bushing, a bolt (M10x68),
and a flat washer (10.2x22x2) through
the hole in the swing arm and through the
loop in the cable. Secure with another bush-
ing (15x19.5), a flat washer (10.2x22x2)
and a nylon nut (M10), after exiting the
opposite side of tube.
• Remove nut on bolt end of cable and
place the weight pin tether (K09) on bolt
shaft. Thread the nut on the bolt end of the
cable all the way to the head of the bolt.
Thread the bolt into the header plate,
making sure that there is a minimum of
0.5” of engagement. Secure by tightening
nut onto header plate.
RED BAG
Bottom View
Cable Termination
Detail