13
3
STEP
• Take the swing arm support (AC3) and
insert into the end of the main floor support
tube (AC1). Align holes in both tubes.
Vertically insert and tighten two bolts
(M10x20) and two flat washers
(10.2x22x2).
• Place the swing arm pulley bracket
(AC2) over the main floor support, aligning
the holes along the intersection point of
swing arm support (AC3) and main floor
support (AC1). Secure in place using four
bolts (M10x123), eight flat washers
(10.2x22x2), and four nylon nuts (M10).
Attach the rear bracket (AC2) to the swing
arm support (AC3) by sliding two bolts
(M10x70) and two flat washers
(10.2x22x2) through and fastening two flat
washers (10.2x22x2) and two nuts (M10).
• Attach the weight stack connecting
brace (AG1) to the weight stack tower
using two bolts (M10x60), four flat washers
(10.2x22x2), and two nylon nuts(M10).
Attach other side of connecting brace to
swing arm support using two bolts
(M10x120), four flat washers (10.2x22x2),
and two nylon nuts (M10).
PINK BAG