M10x125
M10x120
M10x120
12
2
STEP
• Slide a bolt (M10x125) and a flat
washer (10.2x22x2) through the hole,
right of center, on the seat back support
post (AT3). Attach another flat washer
(10.2x22x2) and a nut (M10) to the back
side.
• Place the T-shaped end of center floor
support (without pulley) (AG3) up against
main floor support (AC1). Slide two bolts
(M10x120 on the outside and M10x125
on the inside of the bracket) and two flat
washers (10.2x22x2) through the holes.
Slide another flat washer (10.2x22x2)
onto each bolt and secure with two nylon
nuts (M10).
• Grab the other center floor support (with
pulley) (AG2) and slide the end without
the pulley bracket up to holes next to
where other center floor support (AG3)
was just installed. Secure using two bolts
(M10x125 on the inside and M10x120 on
the outside of the bracket), four flat washers
(10.2x22x2), and two nylon nuts (M10).
• Stand the weight stack tower (AB1)
upright and place it against both center
floor supports. Slide four bolts (M10x70)
and four flat washers (10.2x22x2)
through connecting holes, and secure
bolts with four more flat washers
(10.2x22x2) and four nylon nuts (M10).
BLUE BAG