Spalding 211014 Fitness Equipment User Manual


 
21
03/05 P/N 211014
2.
3.
Remove packaging materials from handle assemblies (P-10 and P-11).
Remove screws on
both sides of tube.
P-11
P-10
P-11
Slide upper tube (P11) onto handle assembly (P-10). Reinsert screws removed in previous step as shown.
P-21
H-24
H-24
H-25
H-25
H-26
H-26
Assemble brackets (P-21) to backboard using bolts (H-25) metal spacers (H-24) and nuts (H-26) as
shown. The spacers may fit very tightly between the brackets and may need to be tapped gently into place
with a hammer.
4.
P-21
Face of Backboard
H-24
H-26
H-25
P-21
Screws removed in step 2
P-10
Rotate upper tube to line up
screw holes. Reinsert screws
removed in previous step as
shown.
NOTE: