STEP 22
• Wrap the PEC DEC CABLE (24) around one 3-1/2” PULLEY
(23) and assemble the PULLEY to the PULLEY BRACKET
(11) using one 3/8 X 2” BOLT (29) and one 3/8” LOCKNUT
(36) as shown in FIGURE 22.
FIGURE 22
FIGURE 23
16
• Insert each end of PEC CABLE (24) into the bushings on the cams of the LEFT (15) & RIGHT (14) PEC ARMS, then drape the
CABLE over the PULLEYS assembled to the CENTER PULLEY BRACKET (16). See FIGURE 23 & 893103 CABLE DIA-
GRAM on PAGE 12.
STEP 23:
3/8 X 2” 29
23
24
36
11
16
14
24
0
1
2
345
6
1/2 1/2 1/2 1/2 1/2 1/2
• After CABLE (18) has been routed over the PULLEYS on the CENTER PULLEY BRACKET (16), position CABLE RETAIN-
ING CLIPS (56) at a 45
o
angle over the PULLEYS and SECURELY tighten.
56