10
0
1
2
345
6
1/2 1/2 1/2 1/2 1/2 1/2
FIGURE 12
• LOOSELY assemble two 3-1/2” PULLEYS (23) and two CABLE RETAINING CLIPS (56) to the CENTER PULLEY
BRACKET (16) using two 3/8 X 2” BOLTS (29), two 3/8” WASHERS (31), and two 3/8” LOCKNUTS (36). See FIGURE 12.
29 3/8 X 2”
23
56
16
31
36
STEP 12:
FIGURE 13
STEP 13:
13
• Assemble two 2” SQ. END CAPS (47) to the
BEARING HOUSING (13) as shown in FIGURE
13.
47
53
• Apply two 1” SQ. GLIDES (53) to the plate on
the BEARING HOUSING (13) as shown in
FIGURE 13.