14
3/8 X 2” 29
• Place one 3-1/2” PULLEY (23) into the loop of
the CABLE (25) below the first and second
PULLEY of the TOP BOOM (2) as shown in
FIGURE 19.
STEP 19:
FIGURE 19
17
36
23
• LOOSELY assemble two 1-3/4 X 5-1/4”
PLATES (17) to each side of the PULLEY
using one 3/8 X 2” BOLT (29) and one 3/8”
LOCKNUT (36). See FIGURE 19.
25
• Create a loop in the CABLE (25) then wrap
the CABLE (25) around the groove of a 3-1/
2” PULLEY (23) and SECURELY assemble
the PULLEY (23) to the TOP BOOM (2)
using one 3/8 X 2-3/4” BOLT (28), two 3/8”
FLANGE SPACERS (42), and one 3/8”
LOCK NUT (36). See FIGURE 18.
STEP 18:
25
FIGURE 18
38
3
0
1
2
345
6
1/2 1/2 1/2 1/2 1/2 1/2
2
• Attach the CABLE (25) from the TOP BOOM
(2) to the CARRIAGE (3) using on QUICK
LINK (38) as shown in FIGURE 18.
3/8 X 2-3/4” 28
36
42
23
42
2
LOOP