FIGURE
3/8" LOW HEIGHT~
STEP 8:
3/8 X 2-3/4
¯ SECURELY assemble the LAT BAR SUPPORT (5) to the TOP BOOM (4) using one 3/8 X 2-3/4" (32) and one 3/8" LOWHEIGH~
NUT (29). See HGURE
¯ Slide two VINYL CAPS (22) over the LAT BAK SUPPORT (5) as sho~ in FIGUPOE
FIGURE 9
CABLE
is routed over bolt!
3/8X2_3/4.,~//
STEP 9:
¯
Route the 117-3/4" CABLE (12) throu~h the TOP BOOM (4) as sho~a in FIGURE 9. (NOTE: It may be necessa~" to remove 3/8
X 2~-3/4
"
BOLT to ensure CABLE is routed over the TOP.. of the BOLT.)
¯ SECURELY assemble three 3-1/2" PULLEYS (9)in!o the slots of the TOP BOOl~ I (4) using three 3/8 X 2-3/4" BOLTS (32), six 3i~" FLA_\’GE
SPACERS (33), and three 3/8" LOCK NLrI’S (3 I) as show~ in FIGURE 9. (NOTE: Make sure the cable is routed over all the pulleys.)
¯ SECURELY retighten the removed 3/8 X 2-3/4" BOLT from the above step.
I 1/2 [ 1/2 [ 1/2 [ I/2 [ 1/2 I 1/2 ¯ "!