9
STEP 11
• Route the new PRESS-STACK CABLE (5) around the pulleys and l-brackets as shown in STEP 11. (Remove pulleys for ease of
installation.)
5
5
FIGURE 11
FIGURE 12
STEP 12
PRESS-STACK
CABLE
(67475)
PRESS-STACK
CABLE
(67475)
5
PRESS-
STACK
CABLE
(67475)
• To assemble the PRESS-STACK CABLE (5)
follow the cable routing as shown and use the
following steps:
• Screw the threaded end of the PRESS-STACK CABLE
(5) approximately 1” into the end of the SELECTOR
SHAFT of the HEAD PLATE on the WEIGHT
STACK as shown in FIGURE 12.
• Route the thread end of PRESS-STACK CABLE (5)
up and over the PULLEY in the TOP BOOM above
the WEIGHT STACK. (Remove pulley for ease of
installation.)
• SECURELY tighten the pulley connection from the
previous step.