13
HEAD PLATE
CABLE
(67250)
STEP 17
FIGURE 17
• Screw one of the threaded ends of the previously
removed HEAD PLATE CABLE approximately 1”
into the end of the WEIGHT STACK SHAFT. See
FIGURE 17.
WEIGHT STACK
SHAFT
STEP 18
• Screw the other threaded end of the HEAD PLATE
CABLE approximately 1” into the end of the shaft
on the D-RING. See FIGURE 18.
FIGURE 18
• Route the thread end of HEAD PLATE CABLE up
and over the PULLEYS in the TOP BOOM above
the WEIGHT STACK. (Remove pulleys for ease
of installation.)
• SECURELY tighten the pulleys connection from the previous step.
D-RING
HEAD PLATE CABLE
(67250)
• Adjust out any slack in the two cable systems. (Refer to your 425104 instructions for the proper procedures.)