Assembly
23
Step 14
Note: Stretch all cables out completely and make sure all twisting is removed before installing.
Install Pec Dec Cable (49) as detailed in Figure 14. Follow dotted lines to identify exact location of pulleys.
See Page 29 “Cable View” for more detail.
You will need the following for installation:
Cable (49) - Qty. 1
Pulley (44) - Qty. 3
Pulley Bracket Block (22) - Qty. 1
Bolt (91) - Qty. 3
Washers (102) - Qty. 6
Nylon Locknut (104) - Qty. 3
Philips Screw (85) - Qty. 2
Figure 14