Assembly
8
7. Position the Left and Right Bottom Handle
Covers to underside of handle assembly, then
connect the EKG Harness Wires to the Left and
Right Bottom Handle Pulse Plates as shown in
Figure 5.
Tighten into place using Philip Screw ST4.2X16
(Qty. 2) and Philip Flathead Screw 4.2*16 (Qty
4).
Next, install the End Caps to the handle
assembly.
IMPORTANT, PLEASE NOTE:
Tighten all hardware installed in Step 1 through
Step 7.
8. Fold the treadmill into the storage position and
lock into place as shown in Figure 6.
CONSOLE
PHILIP SCREW
ST4.2x16
END CAP
EKG HARNESS
LEFT BOTTOM
HANDLE COVER
RIGHT BOTTOM
HANDLE COVER
Figure 5: Left and Right Bottom Handle Cover
Installation
Figure 6: Storage Position Locking Method
PHILIP FLATHEAD
SCREW ST4.2x16