Ironman Fitness 120r Home Gym User Manual


 
Assembly
5
INSTRUCTIONS FOR ASSEMBLY:
Unpack the box in a clear area. Check to make sure all components are present and in good condition.
Do not dispose of the packing material until the assembly is completed. Tools have been provided for you
to use when assembling this product.
Locate the hardware pack and identify the following parts required for assembly.
Tools:
1. ALLEN WRENCH, M5 AND M6
2. PHILLIPS SCREW DRIVER
3. WRENCH
Main Components:
1. OWNER’S MANUAL
2. MAIN FRAME
3. FRONT STABILIZER ASSEMBLY
4. HANDLEBAR W/PULSE ASSEMBLY
6. HANDLE BAR POST
7. TENSION KNOB
10. CONSOLE ASSEMBLY
11. REAR STABILIZER ASSEMBLY
12. PEDALS LEFT AND RIGHT
Hardware:
1. SCREW M8X1 (49) - Qty 8
2. WASHER (63) - Qty 9
3. CARRIAGE SCREW M8X70 (35) - Qty 2
4. NUT M8 (37) - Qty 2
5. ARC WASHER (36) - Qty 6
6. CARRIAGE SCREW M8X40 (48) - Qty 4
7. NYLOCK NUT M8 (60) - Qty 6
8. HEX HEAD SCREW M6X40 (50) - Qty 8
9. WASHER (62) - Qty 8
10. SCREW M8X15 (49) - Qty 8
11. SCREW M5X10 (65) - Qty 1