STEP 5 (See Diagram 5 & Cable Loop Diagram)
A.) Attach the 283” Upper Cable (#48) to the swivel pulley pre-installed in the front of the
Right Lat Bar Frame (#9). Install a Ball Stopper (#46) onto the end of the Cable.
Attach the U-shaped Connector (#28) to the end of the Cable.
B.) Attach a Short Chain (#30) in between the openings on the Connector and secure it
with a M10 x 1 3/8” Allen Bolt (#59), two ∅ ¾” Washers (#64), and one M10 Aircraft Nut
(#66).
C.) Draw the Cable over the Pulley and pull through the Cable sleeve on the Right Lat Bar
Frame. Draw the Cable along the Frame towards the back of the machine to the Pulley
previously installed. Draw the Cable around the Pulley then downward to the Double
Floating Pulley Bracket (#24).
D.) Attach two Pulleys (#36) to the Bracket. Secure them with a M10 x 2 ¾” Allen Bolt
(#55), two Ø ¾” Washers (#64), and one M10 Aircraft Nut (#66).
E.) Draw the Cable around the back Pulley then upward to the bottom of the Lat Bar Frame
Bracket (#20). Install a Pulley.
F.) Draw the Cable around the Pulley then back down to the Double Floating Pulley
Bracket (#24) again. Let the Bracket hanging for now.
G.) Draw the Cable around the front Pulley then upward towards the Pulley on the Left Lat
Bar Frame (#10).
H.) Draw the Cable over the Pulley then along the Left Lat Bar Frame (#10) towards the
front of the machine. Insert the Cable through the Cable sleeve and over the pre-
installed Pulley on the front of the Left Lat Bar Frame.
I.) Install a Ball Stopper (#46) at the end of the Cable and attach a U-shaped Connector
(#28) to the end. Attach a Short Chain (#30) in between the openings on the Connector
and secure it with a M10 x 1 3/8” Allen Bolt (#59), two ∅ ¾” Washers (#64), and one
M10 Aircraft Nut (#66).
J.) Connect the Lat Bar (#11) or Single Handles (#33) to the Short Chains using C-clips
(#32).
12