BEFORE
YOU BEGIN
ASSEMBLY
9
INTRODUCTION
IMPORTANT
PRECAUTIONS
TREADMILL
OPERATION
CONDITIONING
GUIDELINES
TROUBLESHOOTING
& MAINTENANCE
LIMITED
WARRANTY
A Open HARDWARE BAG 2.
B Slide CONSOLE MAST BOOTS
down over BASE FRAME.
C Lift RUNNING DECK to upright
position.
D Insert 4 SCREWS (E) into inside
holes of CONSOLE MAST BOOTS.
E Connect CONSOLE WIRES.
F Slide CONSOLE BRACKETS into
CONSOLE MAST as shown.
G To attach CONSOLE, insert
1 FLAT WASHER (F), 1 LOCK
WASHER (G) and 1 BOLT (D) into
all 6 holes on upper CONSOLE
MASTS.
AS S E MB LY ST EP 2
$0/40-&."45#005
$0/40-&."45
#"4&'3".&
36//*/(%&$,
4$3&84&
$0/40-"$,&54
$0/40-&."45
#0-54%
'-"58"4)&34'
-0$,8"4)&34(
$0/40-&8*3&4
'-"58"4)&3'
NN
2UZ
-0$,8"4)&3(
NN
2UZ
#0-5%
NN
2UZ
4$3&8&
NN
2UZ
HARDWARE BAG 2 CONTENTS :