BEFORE
YOU BEGIN
10
INTRODUCTION
IMPORTANT
PRECAUTIONS
ASSEMBLY
BEFORE
YOU BEGIN
ELLIPTICAL
OPERATION
HORIZON
WARRANTY
TROUBLESHOOTING
& MAINTENANCE
CONDITIONING
GUIDELINES
BEFORE
YOU BEGIN
ASSEMBLY
11
INTRODUCTION
ELLIPTICAL
OPERATION
CONDITIONING
GUIDELINES
TROUBLESHOOTING
& MAINTENANCE
HORIZON
WARRANTY
IMPORTANT
PRECAUTIONS
AS S E M B LY ST E P 4
PEDAL ARM TUBE
TEFLON WASHERS (E)
BOLT (G)
FLAT WASHER (F)
LOWER LINK ARM
LINK ARM BRACKET
SPACER (D)
PEDAL ARM
AS S E M B LY ST E P 5
Open HARDWARE BAG FOR STEP 5.
Slide SPACER (H) into LOWER LINK ARM.
Place TEFLON WASHERS (I) on either side of SPACER (H). While holding TEFLON WASHERS (I) slide LOWER
LINK ARM into bottom end of LOWER HANDLEBAR.
Insert BOLT (J) into LOWER HANDLEBAR and secure using NUT (K).
Repeat on other side.
A
B
C
D
E
GUIDE RAIL
TEFLON WASHERS (I)
LOWER HANDLEBAR
NUT (K)
BOLT (J)
LOWER LINK ARM
SPACER (H)
LOWER LINK ARM
SPACER
TEFLON WASHERS
LOWER
HANDLEBAR
NUT (K)
INSIDE DIAMETER:
8 mm
Qty: 2
BOLT (J)
60 mm
Qty: 2
SPACER (H)
44 mm
Qty: 2
TEFLON WASHER (I)
28.4 mm
Qty: 4
HARDWARE BAG FOR STEP 5 CONTENTS :
Open HARDWARE BAG FOR STEP 4.
Align the bracket on the LEFT LOWER LINK ARM with the tube on the LEFT PEDAL ARM.
Slide the SPACER (D) through the LINK ARM BRACKET and the PEDAL ARM so it can’t rotate.
Insert 2 TEFLON WASHERS (E) between the PEDAL ARM and the LINK ARM BRACKET.
Secure the joint with a FLAT WASHER (F) and BOLT (G).
Repeat on the other side.
A
B
C
D
E
F
BOLT (G)
15 mm
Qty: 2
TEFLON WASHER (E)
30 mm
Qty: 4
SPACER (D)
Qty: 2
FLAT WASHER (F)
35 mm
Qty: 2
HARDWARE BAG FOR STEP 4 CONTENTS :
E401_Rev.1.5.indd 10-11 2/29/08 10:05:37 AM