11
INTRODUCTION
IMPORTANT
PRECAUTIONS
ASSEMBLY
BEFORE
YOU BEGIN
TREADMILL
OPERATION
CONDITIONING
GUIDELINES
TROUBLESHOOTING
& MAINTENANCE
LIMITED
WARRANTY
A. Open HARDWARE BAG 4
B. With running deck in lowered position,
place CONSOLE on upright masts.
C. Secure console by partially inserting
3 BOLTS (D) and 3 FLAT WASHERS
(E) into side of LEFT upright MAST.
Remember to partially install
these bolts.
D. Gently lift right side of the CONSOLE
to connect the CONSOLE CABLE.
Carefully tuck wires in mast to avoid
damage. NOTE: Do not pinch console
cable. Be sure the console cable
prongs are aligned and the ends are
tightly seated into each other.
E. Repeat step C above to assemble the
right side upright mast and console.
F. Tighten all bolts completely.*
G. Once BOLTS (D) have been
completely tightened, insert BOLTS
(F) into the back of the mast and
completely tighten.
BOLT (D)
15 mm
Qty: 6
FLAT WASHER (E)
8 mm
Qty: 6
top view
BOLT (F)
25 mm
Qty: 2
top view
* NOTE: Be careful not to pinch any
wires while assembling the masts.
* Be sure to tighten bolts after all are lined up.
Z01
BOLT (D)
MAST
FLAT WASHER (E)
BOLT (F)
ASSEMBLED IN STEP 4-C
HARDWARE BAG 4 CONTENTS :
A S S E M B LY S T E P 4