Weider XR20 Home Gym User Manual


 
9
CABLE ASSEMBLY
11. During steps 11 through 27, refer to the
CABLE DIAGRAM on page 21 of this manual
to verify proper cable routing. Before begin-
ning this section, identify the Long Cable (23),
the Medium Cable (58), and the Short Cable
(35) by comparing the lengths and ends of
the cables.
IMPORTANT: While assembling the cables,
do not overtighten the bolts and nuts
attaching the pulleys. The pulleys must be
able to turn freely.
12. Locate the Long Cable (23). Route the Long
Cable around a 3 1/2Ó Pulley (15).
Using a 3/8Ó x 3 1/2Ó Bolt (16) and a 3/8Ó
Nylon Jam Nut (67), attach the 3 1/2Ó Pulley
(15) to the Top Frame (55). Be sure that the
end of the Cable with the ball is on the
indicated side of the Pulley and that the
Cable is between the Pulley and the hook
on the Top Frame.
13. Wrap the Long Cable (23) around a ÒVÓ-Pulley
(6). Attach the ÒVÓ-Pulley and a Long Cable
Trap (50) to the indicated bracket on the
Front Upright (42) with a 3/8Ó x 2 1/2Ó Bolt (7)
and a 3/8Ó Nylon Locknut (21). Be sure that
the Long Cable Trap is positioned to hold
the Cable in place.
14. Route the Long Cable (23) around a ÒVÓ-
Pulley (6). Using a 3/8Ó x 2 1/2Ó Bolt (7) and a
3/8Ó Nylon Locknut (21), attach the ÒVÓ-Pulley
(6) and a Long Cable Trap (50) to the Left
Arm (47). Be sure that the Cable is in the
groove of the Pulley and that the Long
Cable Trap (50) is positioned to hold the
Cable in place.
14
11
23
58
35
23
55
67
16
7
50
21
23
6
7
50
23
42
6
12
13
15
Hook
Ball
21
47