Weider WESY16010 Home Gym User Manual


 
8
CABLE ASSEMBLY
11
8
9
10
58
58
55
16
25
Hook
Ball
15
50
58
7
47
58
21
7
21
6
50
23
6
42
8. During steps 9 through 22, refer to the
CABLE DIAGRAM on page 19 of this manual
to verify proper cable routing. Before begin-
ning this section, identify the Short Cable (23)
and the Long Cable (58) by comparing the
lengths and the ends of the cables.
IMPORTANT: While assembling the cables,
do not overtighten the bolts and nuts
securing the pulleys. The pulleys must
turn freely.
9. Locate the Long Cable (58). Route the Long
Cable around a 3 1/2” Pulley (15).
Using a 3/8” x 3 1/2” Bolt (16) and a 3/8”
Nylon Jamnut (25), attach the 3 1/2” Pulley
(15) in the indicated location on the Top Frame
(55). Be sure that the end of the Cable with
the ball is on the indicated side of the
Pulley and that the Cable is between the
Pulley and the hook on the Top Frame
(55).
10. Wrap the Long Cable (58) around a “V”-Pulley
(6). Attach the “V”-Pulley and a Long Cable
Trap (50) to the indicated bracket on the
Front Upright (42) with a 3/8” x 2 1/2” Bolt (7)
and a 3/8” Nylon Locknut (21). Be sure that
the Long Cable Trap is positioned to hold
the Cable in place.
11. Route the Long Cable (58) around a “V”-
Pulley (6). Attach the “V”-Pulley (6) and a
Long Cable Trap (50) to the Left Arm (47)
with a 3/8” x 2 1/2” Bolt (7) and a 3/8” Nylon
Locknut (21). Be sure that the Cable is in
the groove of the Pulley and that the Long
Cable Trap (50) is positioned to hold the
Cable in place.