Weider WESY2916.1 Home Gym User Manual


 
20
34. Wrap the Leg Lever Cable (51) under a 90mm
Pulley (48). Attach the Pulley to the Base (1) with
a
n M10 x 45mm Bolt (86), two Half Guards (55),
and an M10 Nylon Locknut (77).
35. Wrap the Leg Lever Cable (51) over a 90mm
Pulley (48). Attach the Pulley to the Double “U”-
bracket (61) with an M10 x 45mm Bolt (86), two
Half Guards (55), and an M10 Nylon Locknut
(77).
36.
W
rap the Leg Lever Cable (51) under a 90mm
Pulley (48). Attach the Pulley to the Upright (2)
with an M10 x 120mm Bolt (115), two Half Guards
(55), an M10 W
asher (80), and a Cable
T
rap (56).
34
35
77
61
55
55
86
51
48
1
48
55
55
77
51
86
36
115
80
48
56
2
55
55
51