14
25. Wrap the High Cable (73) around a 4Ó Pulley (35).
Attach the Pulley inside the slot in the Main Upright
(3) with a 3/8Ó x 2 1/2Ó Bolt (54), two 3/8Ó Flat
Washers (55), two 5/8Ó x 1/2Ó Pulley Bushings (42),
and a 3/8Ó Nylon Jam Nut (63).
25
55
42
63
3
35
42
55
54
73
26. Disassemble the pre-assembled Pulley Plates (31).
Wrap the High Cable (73) around a 4Ó Pulley (35) in
the direction shown. Attach the Pulley and a Cable
Trap (44) to the upper holes in the indicated ends of
the Pulley Plates (31) with a 3/8Ó x 1 3/4Ó Bolt (60) and
a 3/8Ó Nylon Jam Nut (63). Make sure the Cable is
in the groove of the Pulley and that the Cable
Trap is oriented so it holds the Cable in place.
26
73
60
31
44
35
31
63
These adjustment
holes must be at
the bottom
27. Feed the bolt on the High Cable (73) up through the
indicated slot in the Top Frame (1).
Wrap the High Cable (73) over a 4Ó Pulley (35). Feed
the bolt on the High Cable back down through the slot
in the Top Frame (1).
Attach the 4Ó Pulley (35) inside the slot in the Top
Frame (1) with a 3/8Ó x 2 1/2Ó Bolt (54), two 3/8Ó Flat
Washers (55), two 5/8Ó x 1/2Ó Pulley Bushings (42),
and a 3/8Ó Nylon Jam Nut (63).
27
1
35
42
55
54
63
42
73
55
Bolt
Slot