Vision Fitness ST710 Home Gym User Manual


 
13
STEP
23
B
A
A-D
C
D
Z30
Z31
AK3
AC2
AK2
AK3
Q02
Q01
AK2
AG1
AQ2
Accessory
Hooks
Inside
Accessory
Posts
• Slide the slip on nuts (Z31) over the 8
holes of the 4 attachment clips (Z30). Fasten
one end of the 4 attachment clips (Z30) to
the inside of the right hand weight stack
shield (Q01 @ A, B, C, and D) with four
screws (M5x15). Loosely attach so that the
clips are parallel to the floor. Butt the side of
the left weight stack shield (Q02) up against
the right side and align the holes with the
remaining open holes of the attachment clips.
Attach the shield with four screws (M5x15).
Attach the outside edges of the left and right
shields to the weight stack upper block
(AK2) and lower block (AK3) with four bolts
(M8x20). Tighten screws first, the the bolts.
• Attach the three accessory storage hooks
to the outside of the center weight stack
shield (AQ2) with six bolts (M5x15). Attach
each of the two accessory posts to the out-
side with two flat washers (10.2x22x2) first
& two lock washers (10.2x18.4x2.5)
second, and a bolt (M10x25). Tighten
each. Attach the upper portion of the center
shield to the tab on the functional arm
overhead tube (AG1) with a bolt (M8x20)
and the bottom to the functional arm floor
support (AC2) with two bolts (M8x20).
YELLOW BAG