Vision Fitness ST710 Home Gym User Manual


 
II
JJ
HH
GG
DD
Front Vie
w
Side View
Gussett
22
12
STEP
NOTE: You will need to remove pulleys GG, HH, II,
and JJ to route cable #6.
• Thread the bolt a minimum of 0.5” into
pulley DD. Tighten nut to pulley housing.
Route the cable through the specified pulleys
in the following order: under GG, under
HH, over II, and under JJ. Connect the ter-
mination to the leg press swing arm with a
bolt (M8x19) and a nut (M8).
WARNING:
Failure to thread the specified distance
can result in serious injury!
CABLE #6
(1/4” diameter)