6
P/N 211376A 05/03
6.
Insert ground sleeve (4) and pole section (3) into hole. Fill
remaining hole with concrete. Tamp down concrete to
release air pockets and build drainage hill. Center and level
ground sleeve assembly in hole. Check leveling on all sides
several times while concrete is curing. NOTE: Make sure
concrete is set up to clamp assembly as shown below.
1" (2.54 cm)
FILL TO
HERE
7.
After concrete cures, remove clamp
assembly and lift bottom pole section (3)
from ground sleeve (4) as shown.
3
3
4
IMPORTANT!
WAIT MINIMUM OF 24 HOURS
BEFORE GOING ON TO NEXT STEP.
CONCRETE MUST CURE.
* PLAYING SURFACE
IMPORTANT!
FRONT OF POLE MUST BE PARALLEL WITH
PLAYING SURFACE.
* PLAYING
SURFACE
4