05/03 P/N 211376A
5
5.
Fill hole approximately 3/4 full with
concrete. Tamp down concrete to
release air pockets.
PLAYING
SURFACE
Insert bottom pole section (3) into
ground sleeve (4).
3.
4.
Assemble clamps (7) around bottom pole
and ground sleeve (4) as shown.
5
5
8
8
7
4
7
6
6
IMPORTANT!
CLAMP ASSEMBLY
MUST BE POSITIONED
AS SHOWN BELOW.
7
4
3