STEP 8
Wrap the 94-1/2" CABLE (9) around one 3-1/2" PULLEY (8)
and SECURELY assemble the PULLEY to the PULLEY
BRACKET (5) using one 3/8 X 2" BOLT (14) and one
LOCKNUT (18) as shown in FIGURE
FIGURE 8
FIGURE 9
STEP 9:
¯
Insert each end of the 94-1/2" CABLE (9) into the bushings on the cams of the LEFT (2) & RIGHT (3) PEC ARMS, then
the CABLE over the PULLEYS assembled to the CENTEt~ PULLEY BRACKET (4) as shown in FIGtYRE
¯
After CABLE (9) has been routed over the PULLEYS on the CENTEK PULLEY BRACKET (4), position CABLE RETAINING
CLIPS (13) at a
°
angle ov er th e PULLEYS and SECURELY tighten. Se e FI GUPd3 9.(NOTE: If C.. ~BLE (9)is n ot trac king
in the center of the cams on the LEFT (2) & RIGHT (3) PEC ARMS, Loosen BEARING HOUSI~IG (1) and adjust
then retighten.)