9
STEP 12:
FIGURE 12
• Route the 129-1/2” CABLE (7) through the TOP BOOM and the STACK BOOM (2) as shown in FIGURE 11.
• SECURELY assemble two 3-1/2” PULLEYS (6) to the STACK BOOM (2) using two 3/8 X 2-3/4” BOLTS (13), four 3/8” FLANGE SPACERS
(14), and two 3/8” LOCK NUTS (16) as shown in FIGURE 12. (NOTE: Make sure the cable is routed over all the pulleys.)
3/8 X 2-3/4” 13
7
16
14
6
STEP 11:
FIGURE 11
Make sure CABLE
is routed over bolt!
2
3/8 X 2”
• TIGHTEN any LOOSENED PULLEY connection after CABLE has been routed.
• TIGHTEN any LOOSENED PULLEY connection after CABLE has been routed.