13
• Route the threaded end of the ARM CURL CABLE (11) through the UPRIGHT (5) as shown, then SE-
CURELY assemble one 4-1/2” PULLEY (13) to the UPRIGHT (4) and over the top of the cable using two
3/8 X 2-3/4” BOLTS (22), two 3/8” FLANGE SPACERS (28), two 3/8” WASHERS (25), and two 3/8”
LOCKNUTS (27). (NOTE: The LOW ROW CABLE (11) should be routed over the retaining bolt as
shown in FIGURE 16.)
STEP 16:
22 3/8 X 2-3/4”
11
5
28
• Route threaded end of the ARM CURL CABLE (11) around the bottom pulley of the PULLEY BLOCK
ASSEMBLY as shown in FIGURE 16.
PULLEY
BLOCK
ASSEMBLY
25
13
27
FIGURE 16