Jumpking OR1213 Fitness Equipment User Manual


 
Attach the first hanging point at the upper edge of the
Netting (20) with the G3 Pole (18) to the Hemisphere Cap (19)
of Top enclosure pole(17). Attach a second hanging point directly
across the Netting (20) from the first hanging point.
Attach the other two hanging point halfway between the
first two hanging points, so four hanging points are
attached as shown.
See insert drawing for attached of G3 Pole (18):
Hemisphere Cap (19) has been attached to the top of the
Top enclosure pole(17).
13. Note: During steps 14 and 15, you will
“tie” the lower edge of the Netting(20)
to the V-rings on the bed by straps.
Please see insert drawing a, b, c, d on next page.