Impex PREMIER Home Gym User Manual


 
STEP 8 (See Diagram 8 & Cable Loop Diagram)
A.) Attach the 161” Lower Cable (#27) to the opening on the bottom of the Leg
Developer (#11).
B.) Attach a Pulley (#64) to the opening. Secure it with one M10 x 2 ½” Allen Bolt
(#68), two 7/8” Pulley Bushings (#44), and one M10 Aircraft Nut (#84).
C.) Draw the Cable underneath the Pulley towards the back of the machine to the
opening on the bottom of the Main Base Frame (#1). Install a Pulley as
described in Step B above.
D.) Draw the Cable underneath the Pulley. Insert the Cable through the rectangular
tube and the hole on the bottom of the Vertical Beam to the second open bracket
under the Main Base Frame.
E.) Attach a Pulley to the bracket. Secure it with one M10 x 1 ¾” Allen Bolt (#69),
two ¾” Washers (#81), and one M10 Aircraft Nut (#84).
F.) Pull the Cable upward to the Double Floating Pulley Brackets (#20) previously
installed in Step 6. Install another Pulley. Use any hole on the Bracket for now.
After completing the Cable installation, come back to this Pulley and adjust the
position. If the Cable loop is too loose, move the Pulley up on the Bracket. If the
Cable loop is too tight, move the Pulley down on the Bracket.
G.) Draw the Cable around the Pulley then downward. Attach the Cable to another
Single Floating Pulley Bracket (#22). Install another Pulley. Let the Bracket
hanging for now.
H.) Pull the Cable around the Pulley then upward to the Single Floating Pulley
Bracket (#22) previously in Step 7. Secure the end of the Cable to the Bracket
with one M10 x 1 1/8” Allen Bolt (#71), two ¾” Washers (#81), and one M10
Aircraft Nut (#84).
12