7
ASSEMBLY STEP 2
A Open hardware bag 2.
B With the running deck in the raised
position, attach the left console mast
to the base frame using 4 bolts (b),
4 spring washers (c) and 4 flat
washers (d).
BOLT (B)
20 mm
Qty: 4
SPRING WASHER (C)
15 mm
Qty: 4
FLAT WASHER (D)
15 mm
Qty: 4
HARDWARE BAG 2 CONTENTS :
BOLTS (B)
SPRING WASHERS (C)
FLAT WASHERS (D)
LEFT
CONSOLE
MAST
BASE FRAME
RUNNING DECK
FOOT LATCH