Gold's Gym 580 Home Gym User Manual


 
5
ASSEMBLY
M
ake sure that the power cord is unplugged. Assembly requires two persons. Set the vibration platform in
a cleared area and remove all packing materials. Do not dispose of the packing materials until assembly is com-
pleted.
Assembly requires only the included tools.
Use the drawings below to identify the assembly hardware. The number in parentheses below each drawing is
the key number of the part, from the PART LIST near the end of this manual. Note: If a part is not in the hard-
ware kit, check to see if it is preattached to one of the parts to be assembled. Extra hardware may be included.
To avoid damaging plastic parts, do not use power tools for assembly.
M8 Flat Washer (33)
SW8 Split Washer (34)
SW6 Split Washer (44)
M6 Flat Washer (45)
M8 x 16mm Allen Bolt (39)
M6 x 15mm Screw (38)
1. Insert the Upper Wire (47) downward into the
Upright (1).
Attach the Console (3) to the Upright (1) with
two M6 x 15mm Screws (38), two SW6 Split
Washers (44), and two M6 Flat Washers (45).
47
45
44
38
1
3
1