11
T6
3
79
80
68
68
49
90
90
90
90
87
T2, T4, T7,T9, T10
1
82
87
49
T1
45a
82
49
87
20
T3, T5
75
75
69
69
69
69
49
49
90
90
90
90
87
87
T8
29
T11
87
82
49
95
(45a)
T1
T3
T2
T4
T5
T6
T7
T8
T8
T9T10
T11
T7
STEP 6 INSTALL TOP CABLE
Assemble cables and pulleys simulltaneously.
Insert threaded end of TOP CABLE(45a) into slot in front of TOP FRAME(10), over
pulley T1, around pulley T2, T3, T4, T5, down to pulley T6, around pulley T7, down
to pulley T8, over pulley T9, T10 and screw into SELECTOR ROD(9).
Attach pulley T6 to PRESS UPRIGHT(3) using one 3/8" X 2-3/4" HEX HEAD BOLT
(79), two 3/8" WASHERS(90) and two 3/8" ID X 10mm BUSHINGS(68).