A SERVICE OF

logo

INSTALLATION/OPERATION MANUAL
GARLAND HALF SIZE ELECTRIC CONVECTION OVEN MODEL:MCOE5
Page 5
Part # 4516833 Rev C (19 Mar 2014)
INSTALLATION
KNOCKOUT
PLATE
TERMINAL
BLOCK
BODY SIDE
CONTROL PANEL
ASSEMBLY
Proper placement of the oven will ensure operator
convenience and satisfactory performance.
Adequate clearance must be provided for cleaning,
servicing, and proper operation. (Refer to chart on page 4
for minimum clearances.)
Electrical Connection
Before attempting the electrical connection, the rating
plate should be checked to con rm that the oven’s
electrical characteristics and the electrical supply are
compatible. The plate is located on the inside surface of
the control panel/body side.
1. Open the oven door to reveal the control panel
mounting screws.
2. Remove all screws attaching the control panel
assembly to the oven.
3. Next remove the screws mounting the body side to the
oven in the front and back.
4. Remove the knockout plate at the rear of the oven and
mount the appropriate Size BX connector to fasten the
cord. Re-attach the knockout to the oven.
5. Pass the cord through the bx connector leaving
enough length to reach the terminal block.
6. Strip just enough wire to insert into the terminal block.
7. Tighten terminal block screws and the screws in the BX
to clamp the cord.
8. Verify all electrical connections are correct. Re-attach
the body side and control panel assembly.
Visually inspect all electrical connections. A wiring diagram
is a xed to the inside surface of the control panel/body
side section.
Installation of the wiring must be made in accordance with
UL 197, Commercial Electric Cooking Appliance Standards,
local codes, and the National Electrical Code, ASNI/NFPA 70-
1990, in regard to:
a. Switch panel size
b. Overload protection
c. Wire type
d. Wire size
e. Temperature limitations of wires
f. Method of connection, (conduit, cable, etc.)